Tuesday, July 2, 2013
Getting ready for CCNP ROUTE
Exam Topics
The following information provides general guidelines for the content likely to be included on the exam. However, other related topics may also appear on any specific delivery of the exam. In order to better reflect the contents of the exam and for clarity purposes the guidelines below may change at any time without notice.
Implement an EIGRP based solution, given a network design and a set of requirements
Determine network resources needed for implementing EIGRP in a network
Create an EIGRP implementation plan
Create an EIGRP verification plan
Configure EIGRP routing
Verify an EIGRP solution was implemented properly using show and debug commands
Document the verification results for an EIGRP implementation
Implement a multi-area OSPF Network, given a network design and a set of requirements
Determine network resources needed for implementing OSPF on a network
Create an OSPF implementation plan
Create an OSPF verification plan
Configure OSPF routing
Verify OSPF solution was implemented properly using show and debug commands
Document the verification results for an OSPF implementation plan
Implement an eBGP based solution, given a network design and a set of requirements
Determine network resources needed for implementing eBGP on a network
Create an eBGP implementation plan
Create an eBGP verification plan
Configure eBGP routing
Verify eBGP solution was implemented properly using show and debug commands
Document verification results for an eBGP implementation plan
Implement an IPv6 based solution, given a network design and a set of requirements
Determine network resources needed for implementing IPv6 on a network
Create an IPv6 implementation plan
Create an IPv6 verification plan
Configure IPv6 routing
Configure IPv6 interoperation with IPv4
Verify IPv6 solution was implemented properly using show and debug commands
Document verification results for an IPv6 implementation plan
Implement an IPv4 or IPv6 based redistribution solution, given a network design and a set of requirements
Create a redistribution implementation plan based upon the results from a redistribution analysis
Create a redistribution verification plan
Configure a redistribution solution
Verify that a redistribution was implemented
Document results of a redistribution implementation and verification plan
Identify the differences between implementing an IPv4 and IPv6 redistribution solution
Implement Layer 3 Path Control Solution
Create a Layer 3 path control implementation plan based upon the results of the redistribution analysis
Create a Layer 3 path control verification plan
Configure Layer 3 path control
Verify that a Layer 3 path control was implemented
Document results of a Layer 3 path control implementation and verification plan
Implement basic teleworker and branch services
Describe broadband technologies
Configure basic broadband connections
Describe basic VPN technologies
Configure GRE
Describe branch access technologies
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment